80.2 F
Basseterre

Groundbreaking of the Desalination Plant in Basseterre

Date:

Groundbreaking of the Desalination Plant in Basseterre

Details:

Attendees include the Hon. Prime Minister, Dr. Terrance Drew, other members of Cabinet, the Hon. Minister of Utilities, Konris Maynard, Permanent Secretaries and Heads of Government Departments, and representatives the Republic of China (Taiwan).

When & Where:

July 17, 2024 (2:00 pm) – July 17, 2024 (4:00 pm)

C.A. Paul Southwell Industrial Site in Basseterre

Organizer:

The Ministry of Public Infrastructure, Energy, Utilities and Domestic Transport

The Ministry of Public Infrastructure, Energy, Utilities and Domestic Transport

Related articles

PWD: Temporary Office Closure Notice

Basseterre, St. Kitts (Public Infrastructure NEWS) – The Public Works Department (PWD) advises the general public that its offices...

The WSD Invites Quotations for 2 Double Cab Pick-up Trucks

Basseterre, St. Kitts (Public Infrastructure News) - The Government of St. Kitts and Nevis through the St. Kitts...

Vacancy: Project Assistant (Renewable Energy & Microgrids)

Basseterre, St. Kitts (Public Infrastructure News) – The Taiwan Technical Mission is seeking a highly motivated and technically proficient...

RFQ: 5-Tonne Vibratory Compact Roller and 5-Yard Tipper Truck

Basseterre, St. Kitts (Public Infrastructure News) – The Government of St. Kitts and Nevis through the St. Kitts Public Works...
Call Now Button