WSD Activities for June 13, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The St. Kitts Water Services Department will continue repair and maintenance work on the island on Friday June 13, 2025.

The team will resume work on the Bird Rock desalination line, conduct an assessment at Lamberts Project and pump water to the Southeast Peninsula. Additionally, the team will flush the line from Camps to Half Way Tree, repair pipes in Shadwell and Conyers, replace connections on George Street, and establish new connections at Port Zante, Douglas Estate, Romney Ground and Downing Street.

For more information or urgent concerns, please contact our office at (869) 467-1005 or our emergency hotline at (869) 662-4307.

Stay informed by visiting our website at mopieudt.gov.kn and following our Facebook page.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout Flyer

Related articles

WSD Works Across Communities to Maintain and Repair Water Network

Basseterre, Saint Kitts (Public Infrastructure News) – The Saint Kitts Water Services Department (WSD) will continue critical maintenance and...

WSD Conducts Routine Maintenance and Critical Repairs Across the Water Distribution Network

Basseterre, Saint Kitts (Public Infrastructure News) – The Saint Kitts Water Services Department (WSD) will continue critical maintenance and...

WSD Invests in Personnel Training to Strengthen Desalination Operations

Basseterre, Saint Kitts (Public Infrastructure News) – The Saint Kitts Water Services Department (WSD) is benefitting from technical training...

WSD Charges Ahead with Network Repairs and Maintenance

Basseterre, Saint Kitts (Public Infrastructure News) – The Saint Kitts Water Services Department (WSD) will continue critical maintenance and...